Steel scaffolding for oil, gas & industrial plants · KSA
Idle trades waiting for access cost more than the scaffold. We supply, design, erect and inspect galvanised steel scaffolding for refineries, gas plants, tank farms and shutdowns, so your work fronts open on time and stay safe.
Walk the scaffold
Independent tied scaffold · 4 bays × 5 lifts · top working platform at +10.0 m.
About AL-YASSIN

BS EN 39 tube, BS EN 74 couplers and system components with traceable mill and load certificates.
Scaffolders, chargehands and inspectors with third-party competency cards, briefed for permit-to-work sites.
Anything outside TG20 compliance gets a design and a calculation before a single tube leaves the yard.
GRN, issue, return and inspection on each item, so hire charges stop the day the steel comes back.
Built for your role
Everyone on site needs something different from the scaffold contractor. Pick your role.
In the field
Columns, bridges, towers and live units. Tap any photo to see it full size.
Sectors
Hydrocarbon plants are hard places to build access. Hot surfaces, live lines, permit queues and tight turnaround windows are normal for us.
Access to columns, exchangers, heaters and pipe racks, around live plant and under hot-work permits.
Spheres, separators, compressors and flare structures, planned around operations and isolation windows.
Shell, roof and nozzle access for tank construction, repair and inspection, including internal birdcages.
Access for jacket and topside fabrication in the yard, with high towers, cantilevers and heavy-duty decks.
Module and pipe-spool access, material yards with GRN-to-return control, and rapid re-deployment between bays.
Pre-built access before shutdown, round-the-clock crews in the window, and a clean strip-out before start-up.
Our systems
Pick a system, set the bays and lifts, and turn the scaffold with your mouse or finger. The take-off updates as you go.
Take-off counted from the 3D model shown, including the ladder-access landings. Indicative for an independent tied scaffold. Final quantities, ties and load class come from the TG20 / TG30 compliance sheet or a scaffold design.
Services
From a single tower to a full turnaround package, we supply the steel, the crew and the paperwork.
The cost of waiting
Late or failed scaffolds leave paid crews standing. Enter your own figures to see what access delays cost your project.
Starting values are examples only. Use your own crew rates and delay history.
What you receive
Every scaffold comes with the records your HSE team, client and auditors will ask for.
Why AL-YASSIN
Night shifts, emergency call-outs and alterations while the unit is down and the clock is running.
Every scaffold re-inspected at least every 7 days, after bad weather and after any alteration, then re-tagged.
Refineries, fabrication yards, tank farms, turnarounds and offshore jackets across KSA, UAE and Egypt.
Measured on agreed rules with a signed sheet, so every invoice can be checked line by line.
Work-rest cycles, shaded welfare and early starts planned into the programme.
Green for use, red for no access. The tag, the register and the handover certificate always match.
How we work
Every job follows the same controlled sequence, with a hold point before anyone steps on a board.
Questions
Straight answers to what clients ask us most. Anything else, send us the scope.
Coverage
Where we mobilise from, how far each site is from the Dammam yard, and which services are available at each location.
| Location | Region | Key facilities | From Dammam | Coverage |
|---|
Distances are straight-line from the Dammam yard. Facility types are public information about each industrial area and do not imply a contract with any operator.
For inquiries
Drawings, photos or a rough sketch are enough to start. We come back with quantities, a programme and a price.
Give us the basics and we'll come back with quantities, a programme and a price. Fields marked * are required.
Send it the way that suits you. Attach drawings or photos in the email or chat.